Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the disable-gutenberg domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/enktgvd/staging/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/enktgvd/staging/wp-includes/functions.php on line 6114
Interruzione acquedotto Blufi - Siciliacque
Avvisi
Pubblicato il

24 Novembre 2023

Autore

Siciliacque

Tempo di lettura

29 sec

Interruzione acquedotto Blufi

 Si comunica che i lavori previsti sull’acquedotto Olivo sono stati posticipati al 29/11/23 a causa delle cattive condizioni meteorologiche.
Ciò detto, si comunica che alle ore 08:00 del 29/11/23 sarà interrotto l’esercizio dell’acquedotto Blufi con conseguente
interruzione della fornitura idrica ai Comuni di Barrafranca, Butera, Mazzarino, Licata, Pietraperzia e Riesi, al Consorzio di Bonifica 6 Enna ed all’ASI di Butera.
Si prevede di potere ripristinare le forniture idriche nei tempi di seguito indicati:

  • comuni di Pietraperzia, Barrafranca, CB6 EN, entro le ore 15:00 del 30/11/23;
  • comuni di Mazzarino e Riesi, entro le ore 16:00 del 30/11/23;
  • Utenze di rete esterna acquedotto Gela-Licata (Manfria, Desusino, Tenutella, Falconara, Serenusa) e Z.I. di Butera, entro le 18:00 del 30/11/23

Palermo 24.11.2023